Total Failures
3results
77%vs prev period
Total Downtime
10.4h
86%vs prev period
Avg. Downtime
3.47h
40%vs prev period
High Risk
0results
100%vs prev period
AI Analysis
Incident Count
Monthly Downtime
Line Downtime (Top 10)
Equipment Name Downtime (Top 10)
Failure Location Breakdown
Failure Phenomenon Breakdown
Top 10 Parts by Frequency
Maintenance Reports
| Date ↓ | Line | Equipment Name | Failure Location | Description | Hours | Risk |
|---|---|---|---|---|---|---|
| 2026-06-08 | Assembly | Call Back Repair on Equipment B: Hydraulic - Design Flaw | 1.6 | Low | ||
| 2026-06-03 | Painting | Repair on Equipment E: Sensor - Calibration Drift | 3.0 | Low | ||
| 2026-06-01 | Assembly | Repair Reactive on Equipment B: Mechanical - Overload | 5.8 | Low | ||
| 2026-05-31 | Painting | Repair on Equipment E: Sensor - Wear | 7.8 | Medium | ||
| 2026-05-30 | Welding | Call Back Repair on Equipment D: Software - Design Flaw | 7.4 | Low | ||
| 2026-05-28 | Welding | Call Back Repair on Equipment C: Mechanical - Design Flaw | 2.7 | Low | ||
| 2026-05-19 | Welding | Call Back Repair on Equipment C: Mechanical - Wear | 2.4 | Medium | ||
| 2026-05-17 | Assembly | Repair on Equipment B: Mechanical - Misalignment | 0.8 | Medium | ||
| 2026-05-15 | Welding | Call Back Repair on Equipment D: Mechanical - Material Fatigue | 11.6 | Medium | ||
| 2026-05-15 | Assembly | Call Back Repair on Equipment B: Software - Material Fatigue | 8.6 | High | ||
| 2026-05-15 | Assembly | Repair on Equipment A: Sensor - Corrosion | 8.1 | High | ||
| 2026-05-13 | Inspection | Call Back Repair on Equipment F: Hydraulic - Material Fatigue | 4.5 | Low | ||
| 2026-05-05 | Inspection | Repair on Equipment F: Software - Wear | 9.2 | Medium | ||
| 2026-05-03 | Assembly | Repair on Equipment A: Hydraulic - Material Fatigue | 6.8 | Low | ||
| 2026-05-03 | Welding | Repair on Equipment D: Software - Wear | 1.9 | Medium | ||
| 2026-05-01 | Welding | Call Back Repair on Equipment C: Mechanical - Wear | 3.5 | Medium | ||
| 2026-04-29 | Welding | Repair Reactive on Equipment D: Pneumatic - Material Fatigue | 6.3 | High | ||
| 2026-04-29 | Inspection | Call Back Repair on Equipment F: Electrical - Wear | 2.3 | Low | ||
| 2026-04-27 | Assembly | Repair Reactive on Equipment B: Mechanical - Overload | 8.7 | Medium | ||
| 2026-04-27 | Assembly | Repair Reactive on Equipment B: Electrical - Corrosion | 8.1 | Medium |
Page 1 of 21