Total Failures

3results

77%vs prev period

Total Downtime

10.4h

86%vs prev period

Avg. Downtime

3.47h

40%vs prev period

High Risk

0results

100%vs prev period

AI Analysis

Incident Count

Monthly Downtime

Line Downtime (Top 10)

Equipment Name Downtime (Top 10)

Failure Location Breakdown

Failure Phenomenon Breakdown

Top 10 Parts by Frequency

Maintenance Reports

Date ↓LineEquipment NameFailure LocationDescriptionHoursRisk
2026-06-08AssemblyCall Back Repair on Equipment B: Hydraulic - Design Flaw1.6Low
2026-06-03PaintingRepair on Equipment E: Sensor - Calibration Drift3.0Low
2026-06-01AssemblyRepair Reactive on Equipment B: Mechanical - Overload5.8Low
2026-05-31PaintingRepair on Equipment E: Sensor - Wear7.8Medium
2026-05-30WeldingCall Back Repair on Equipment D: Software - Design Flaw7.4Low
2026-05-28WeldingCall Back Repair on Equipment C: Mechanical - Design Flaw2.7Low
2026-05-19WeldingCall Back Repair on Equipment C: Mechanical - Wear2.4Medium
2026-05-17AssemblyRepair on Equipment B: Mechanical - Misalignment0.8Medium
2026-05-15WeldingCall Back Repair on Equipment D: Mechanical - Material Fatigue11.6Medium
2026-05-15AssemblyCall Back Repair on Equipment B: Software - Material Fatigue8.6High
2026-05-15AssemblyRepair on Equipment A: Sensor - Corrosion8.1High
2026-05-13InspectionCall Back Repair on Equipment F: Hydraulic - Material Fatigue4.5Low
2026-05-05InspectionRepair on Equipment F: Software - Wear9.2Medium
2026-05-03AssemblyRepair on Equipment A: Hydraulic - Material Fatigue6.8Low
2026-05-03WeldingRepair on Equipment D: Software - Wear1.9Medium
2026-05-01WeldingCall Back Repair on Equipment C: Mechanical - Wear3.5Medium
2026-04-29WeldingRepair Reactive on Equipment D: Pneumatic - Material Fatigue6.3High
2026-04-29InspectionCall Back Repair on Equipment F: Electrical - Wear2.3Low
2026-04-27AssemblyRepair Reactive on Equipment B: Mechanical - Overload8.7Medium
2026-04-27AssemblyRepair Reactive on Equipment B: Electrical - Corrosion8.1Medium
Page 1 of 21